P.A.S.S. Lebanon

Characteristics

  • Automatic welding of the root-pass GMAW-RMD without copper-backing.
  • Filling/ capping with Advanced Pulse (P-GMAW).

P.A.S.S. Executes 24 km Water Pipeline Project in Lebanon

P.A.S.S. successfully completed a 24 km water pipeline project in Lebanon for the Council for Development and Reconstruction (CDR). This strategic project was developed to enhance Lebanon’s water distribution infrastructure, supporting both industrial and residential needs across the country.

About P.A.S.S.

P.A.S.S. is a leading engineering and construction company specializing in pipeline projects and infrastructure development. Our commitment is to deliver innovative, reliable, and high-quality solutions that ensure operational excellence and long-term performance.

Lebanon Water Pipeline Project

The 24 km pipeline project utilizes X65 steel pipes with diameters ranging from 64" to 68". P.A.S.S. successfully applied the PWT XCS automatic welding system on the project, achieving consistent, high-quality welds with maximum efficiency for large-scale water transmission infrastructure.

  • High-quality X65 steel pipes (64"–68") for durable, high-pressure water transmission
  • 24 km of strategically routed pipeline
  • Advanced PWT XCS automatic welding system for maximum precision and efficiency
  • Critical infrastructure enhancing Lebanon’s water supply reliability

This modern water pipeline project demonstrates Lebanon’s growing capacity to deliver world-class infrastructure. By combining P.A.S.S.’s engineering expertise with advanced welding technology, the project strengthens local capabilities, creates skilled jobs, and ensures safe and efficient water distribution across the region.