Van Oord - Dos Bocas Refinery
Diameter: 36''
WT: 22mm
Distance: 42km
Characteristics
- Automatic welding of the root-pass GMAW-RMD without copper-backing.
- Filling/ capping with Advanced Pulse (P-GMAW).
Van Oord executed pipeline works for the Dos Bocas Refinery Project in Mexico
In Mexico, Van Oord successfully executed pipeline construction works, with automic welding, for the Dos Bocas Refinery Project, a strategic development designed to expand the country’s crude oil refining capacity. This project involved the installation of a 36-inch crude oil pipeline over a distance of 42 km, providing a vital link to support refinery operations and ensure reliable energy supply for the region.
About Van Oord
Van Oord is an internationally renowned engineering and construction company specializing in marine, energy, and infrastructure projects. With decades of expertise, the company delivers engineering, procurement, construction, and installation (EPCI) services for oil & gas, energy, and maritime sectors. Van Oord leverages advanced technologies, efficient project execution, and skilled personnel to deliver reliable and sustainable infrastructure solutions worldwide.
Dos Bocas Refinery – Pipeline Construction
The Dos Bocas Refinery pipeline project is a 42 km crude oil pipeline using X65, 36” diameter pipe with 22 mm wall thickness. The project was designed to ensure the efficient transport of crude oil into the refinery, enhancing Mexico’s refining capacity and supporting energy independence goals. Key technical highlights include:
- Challenging soil conditions along the 42 km route, requiring specialized trenching and stabilization techniques.
- High humidity and coastal climate at Dos Bocas demanded additional corrosion protection and coating measures.
- Heavy logistical operations to transport and handle 36” X65 pipes with 22 mm wall thickness across difficult terrain.
- Coordination with refinery construction works, ensuring safe and seamless integration with other ongoing mega-project activities.
- Strict environmental safeguards implemented to minimize impact on surrounding wetlands and ecosystems near the Gulf of Mexico.
- Local workforce training and deployment to meet project demands while enhancing regional expertise.
Through this project, Van Oord demonstrated its capabilities in pipeline construction, supporting the Dos Bocas Refinery in strengthening Mexico’s energy infrastructure, reducing dependency on imports, and advancing national energy security objectives.