title: Automatic Welding Albawani – Master Gas System 3 (MGS3) Package 9
description: "AlBawani is constructing the 320km Saudi Aramco’s Master Gas System 3 (MGS-3) Package #09 pipeline using Qapqa automatic pipeline welding technology"
---

[info@qapqa.com](mailto:info@qapqa.com)[Linkedin](https://www.linkedin.com/company/qapqa/)[+31 (0) 321 38 66 77](tel:+31(0)321386677)[Contact us](https://qapqa.com/contact-us/)

[Contact us](https://qapqa.com/contact-us/)[info@qapqa.com](mailto:info@qapqa.com)[+31 (0) 321 386 677](tel:+31(0)321386677)[Linkedin](https://www.linkedin.com/company/qapqa/)[YouTube](https://www.youtube.com/@QapqaGroup)

[![Qapqa-logo-CMYK\_incl JS kleur](https://qapqa.com/hs-fs/hubfs/Qapqa-logo-CMYK_incl%20JS%20kleur.png?width=1894&height=816&name=Qapqa-logo-CMYK_incl%20JS%20kleur.png "Qapqa-logo-CMYK_incl JS kleur")](https://qapqa.com/)

[![Qapqa joining solutions automatic welding technology logo grey orange](https://qapqa.com/hs-fs/hubfs/Qapqa-logo-CMYK_incl%20JS%20kleur.png?width=1894&height=816&name=Qapqa-logo-CMYK_incl%20JS%20kleur.png "Qapqa joining solutions automatic welding technology logo grey orange")](https://qapqa.com/)

- [Services](https://qapqa.com/services)
- [Equipment](https://qapqa.com/equipment)
- [Projects](https://qapqa.com/references/)
    - [Reference letters](https://qapqa.com/reference-letters)
- [Solutions](https://qapqa.com/solutions/)
- [Industries](https://qapqa.com/industries)
- [News](https://qapqa.com/news-events)
- [About us](https://qapqa.com/about-us/)

[Contact](https://qapqa.com/contact-us/)

[Contact](https://qapqa.com/contact-us/)

- [Services](https://qapqa.com/services)
- [Equipment](https://qapqa.com/equipment)
- [Projects](https://qapqa.com/references/)

    - [Reference letters](https://qapqa.com/reference-letters)
- [Solutions](https://qapqa.com/solutions/)
- [Industries](https://qapqa.com/industries)
- [News](https://qapqa.com/news-events)
- [About us](https://qapqa.com/about-us/)

[Contact](https://qapqa.com/contact-us/)

# Al Bawani - Master Gas System Network (MGS-3) Package #09

![Company](https://qapqa.com/hubfs/svg-gobbler.svg)

**Company:** AlBawani Water & Power Company (AWP) 

Company: AlBawani Water & Power Company (AWP)

![Type](https://qapqa.com/hubfs/svg-gobbler%20(3).svg)

 **Type:** Gas Pipeline

Type: Gas Pipeline

![Country](https://qapqa.com/hubfs/svg-gobbler%20(1).svg)

**Country:** Saudi Arabia

Country: Saudi Arabia

![svg-gobbler (6)](https://qapqa.com/hubfs/svg-gobbler%20(6).svg)

 **Project:** Master Gas System Network (MGS-3) Package #09

Project: Master Gas System Network (MGS-3) Package #09

![svg-gobbler (2)](https://qapqa.com/hubfs/svg-gobbler%20(2).svg)

**Material:** X70

Material: X70

![client](https://qapqa.com/hubfs/Qapqa_April2024/images/svg-gobbler%20(4).svg)

 **Client:** Saudi Aramco

Client: Saudi Aramco

![diameter icon](https://qapqa.com/hubfs/diameter%20icon.svg)

 **Diameter:** 56"    
**WT:** 17 - 26mm

 

Diameter: 56" WT: 17 - 26mm

![distance](https://qapqa.com/hubfs/Qapqa_April2024/images/svg-gobbler%20(5).svg)

**Distance:** 320km (ongoing)

Distance: 320km (ongoing)

Characteristics

- Automatic welding of the root-pass GMAW-RMD with copper-backing.
- Filling/ capping with Advanced Pulse (P-GMAW).
- Welding in ambiental temperature over **50 degrees celsius**.

## Al Bawani commenced construction on the Master Gas System 3 – Package #09 for Saudi Aramco

In 2024, Al Bawani Water & Power Company (AWP) ([Formerly A.Hak Pijpleidingen’s Saudi Arabia](https://albawani.com/en/albawani-water-power-company-awp-signed-an-acquisition-agreement-for-the-entire-shares-of-a-hak-saudi-arabia-at-the-dutch-embassy-in-riyadh/)) in partnership with **Qapqa** commenced work on the **Master Gas System 3 (MGS-3) – Package #09** for **Saudi Aramco** in **Saudi Arabia**. This critical pipeline development is part of Aramco’s large-scale expansion of the **East-West Gas Pipeline network**, designed to boost the capacity, reliability, and efficiency of natural gas transmission across the Kingdom. The project strengthens the backbone of Saudi Arabia’s energy infrastructure by integrating additional pipeline sections and enhancing connectivity across compressor stations.

## About A.Hak Saudi Arabia & Albawani

**A.Hak Saudi Arabia** was a leading contractor **specialized in the construction of pipelines** for example for water, oil and gas. in 2022 **Al Bawani** acquired A.Hak to enhance Al Bawani’s capabilities in infrastructure development, leveraging A.Hak’s extensive experience with major clients such as Aramco, Saline Water Conversion Corporation (SWCC), and the National Water Company (NWC). Al Bawani is one of Saudi Arabia’s fastest growing construction groups, delivering large-scale energy and infrastructure projects across the Kingdom.

## [Master Gas System 3](https://www.blackridgeresearch.com/project-profiles/latest-details-saudi-aramco-master-gas-system-expansion-project-phase3-saudi-arabia) – Package #09

The **Master Gas System 3 – Package #09** in Saudi Arabia is a **strategic pipeline project** that involves complex engineering, welding, and construction works across desert terrain. This package plays a vital role in expanding the East-West Pipeline system and enabling higher natural gas throughput. Key project highlights include:

- Construction of new **high-pressure gas transmission pipelines** to expand the MGS-3 network.
- Integration with **Aramco’s East-West system**, improving resilience and capacity for gas delivery across the Kingdom.
- Execution in **harsh desert conditions**, requiring advanced logistics, heat-resistant welding technologies, and strict safety measures.
- Deployment of **automatic welding solutions** to ensure consistent quality and productivity across large-diameter pipelines.
- Alignment with **Saudi Vision 2030** goals to strengthen natural gas infrastructure and diversify the national energy mix.

By integrating **Qapqa’s pipeline welding expertise** and the [advanced PWT XCS automatic welding system](https://qapqa.com/equipment/xcs-welding-system/) with Albawani’s strong regional capabilities, the Master Gas System 3 – Package #09 project strengthens Saudi Arabia’s gas transmission network and ensures reliable supply to meet the Kingdom’s rising industrial and residential energy demand.

[![mgs3 package 9 albawani ahak pijpleidingen qapqa welding project](https://qapqa.com/hs-fs/hubfs/mgs3%20package%209%20albawani%20ahak%20pijpleidingen%20qapqa%20welding%20project.webp?width=1500&height=890&name=mgs3%20package%209%20albawani%20ahak%20pijpleidingen%20qapqa%20welding%20project.webp)](https://qapqa.com/hubfs/mgs3%20package%209%20albawani%20ahak%20pijpleidingen%20qapqa%20welding%20project.webp)

[![albawani ahak pijpleidingen qapqa automatic welding mgs3 package 9 construction](https://qapqa.com/hs-fs/hubfs/albawani%20ahak%20pijpleidingen%20qapqa%20automatic%20welding%20mgs3%20package%209%20construction.webp?width=1500&height=890&name=albawani%20ahak%20pijpleidingen%20qapqa%20automatic%20welding%20mgs3%20package%209%20construction.webp)](https://qapqa.com/hubfs/albawani%20ahak%20pijpleidingen%20qapqa%20automatic%20welding%20mgs3%20package%209%20construction.webp)

[![automatic welding qapqa system ahak albawani mgs3 package 9 pipelines](https://qapqa.com/hs-fs/hubfs/automatic%20welding%20qapqa%20system%20ahak%20albawani%20mgs3%20package%209%20pipelines.webp?width=1500&height=890&name=automatic%20welding%20qapqa%20system%20ahak%20albawani%20mgs3%20package%209%20pipelines.webp)](https://qapqa.com/hubfs/automatic%20welding%20qapqa%20system%20ahak%20albawani%20mgs3%20package%209%20pipelines.webp)

[![ahak albawani qapqa pipeline welding aramco master gas system 3 package 9](https://qapqa.com/hs-fs/hubfs/ahak%20albawani%20qapqa%20pipeline%20welding%20aramco%20master%20gas%20system%203%20package%209.webp?width=1500&height=890&name=ahak%20albawani%20qapqa%20pipeline%20welding%20aramco%20master%20gas%20system%203%20package%209.webp)](https://qapqa.com/hubfs/ahak%20albawani%20qapqa%20pipeline%20welding%20aramco%20master%20gas%20system%203%20package%209.webp)

[Started welding for Package #9 of Saudi Aramco's Master Gas System-3](https://qapqa.com/news-events/started-welding-for-package-9-of-saudi-aramcos-master-gas-system-3)

![pipeline welding for Package #9 of Saudi aramco's Master Gas System-3 (MGS-3) project](https://qapqa.com/hubfs/pipeline%20welding%20activities%20started%20for%20Package%20%239%20of%20Saudi%20aramcos%20Master%20Gas%20System-3%20(MGS-3)%20project.webp)

[News](https://qapqa.com/news-events/tag/news)

#### Started welding for Package #9 of Saudi Aramco's Master Gas System-3

Aug 8, 2025, 10:42:54 AM 1 min read

[New contract for Aramco’s Master Gas System-3 (MGS-3) Project secured](https://qapqa.com/news-events/new-contract-secured-aramco-mgs3)

![qapqa new partnership ahak](https://qapqa.com/hubfs/qapqa%20new%20partnership%20ahak.webp)

[News](https://qapqa.com/news-events/tag/news)

#### New contract for Aramco’s Master Gas System-3 (MGS-3) Project secured

Jun 20, 2025, 11:28:29 AM 1 min read

[51 Pipeline welds completed in single shift with zero repair rate](https://qapqa.com/news-events/51-pipeline-welds-completed-in-single-shift-100-aut-accepted)

![51 welded joints on pipeline completed in Single Shift 100% AUT accepted](https://qapqa.com/hubfs/51%20Welded%20joints%20on%20pipeline%20project%20Completed%20in%20Single%20Shift%20-%20100%25%20AUT%20Accepted.webp)

[News](https://qapqa.com/news-events/tag/news)

#### 51 Pipeline welds completed in single shift with zero repair rate

Dec 1, 2025, 2:30:00 AM 1 min read

[35 welds in ten hour shift on the MGS 3 Package 9 pipeline](https://qapqa.com/news-events/35-welds-in-ten-hour-shift-on-the-mgs-3-package-9-pipeline)

![pipeline construction master gas system 3 package 9 ](https://qapqa.com/hubfs/AlBawani%20master%20gas%20system%203%20package%209%20pipeline%20construction.webp)

[News](https://qapqa.com/news-events/tag/news)

#### 35 welds in ten hour shift on the MGS 3 Package 9 pipeline

Jan 16, 2026, 3:30:00 PM 1 min read

[56 Inch Pipeline PQT Completed with 2 Welds Using Automatic Welding](https://qapqa.com/news-events/56-inch-pipeline-pqt-completed-with-2-welds-using-automatic-welding)

![PQT for a 56 inch pipeline completed with only 2 welds](https://qapqa.com/hubfs/pqt%20albawani%20completed%20in%202%20welds.webp)

[News](https://qapqa.com/news-events/tag/news)

#### 56 Inch Pipeline PQT Completed with 2 Welds Using Automatic Welding

Jun 8, 2026, 3:16:33 PM 1 min read

[![Qapqa member of International Pipe Line &amp; Offshore Contractors Association](https://qapqa.com/hs-fs/hubfs/IPLOCA%20Web%20Square%2050x50.png?width=50&height=50&name=IPLOCA%20Web%20Square%2050x50.png)](https://www.iploca.com/members/qapqa-group-b-v/) [![tuv cert logo](https://qapqa.com/hs-fs/hubfs/tuv%20cert%20logo.webp?width=50&height=50&name=tuv%20cert%20logo.webp)](https://www.tuv-nord.com/) ![PWT Qapqa brand](https://qapqa.com/hs-fs/hubfs/Qapqa_April2024/images/PWT-logo-wit-shade.png?width=50&height=50&name=PWT-logo-wit-shade.png)

---

[![qapqa linkedin ](https://qapqa.com/hs-fs/hubfs/qapqa-linkedin-300x64.png?width=125&height=27&name=qapqa-linkedin-300x64.png)](https://www.linkedin.com/company/qapqa-bv/)   
[![qapqa youtbue](https://qapqa.com/hs-fs/hubfs/qapqa-youtbue-300x64.png?width=125&height=27&name=qapqa-youtbue-300x64.png)](https://www.youtube.com/@Qapqagroup)

**Headquarters**   
Qapqa B.V.  
De Amer 24  
8253 RC Dronten  
The Netherlands

**E.** [info@qapqa.com](mailto:info@qapqa.com)  
**T.** [+31 (0) 321 386 677](tel:+31%20(0)%20321%2038%2066%2077)

**Production and R&D**   
Qapqa Italy S.r.l.  
Via Salvo d’Acquisto 1  
26862 Guardamiglio (LO)  
Italy

**E.** [info.it@qapqa.com](mailto:info.it@qapqa.com)  
**T.** [+39 037 740 0038](tel:+39%20037%20740%200038)

[Disclaimer](https://qapqa.com/disclaimer/) | [Privacy statement](https://qapqa.com/hubfs/Qapqa_April2024/pdfs/Privacy%20Statement%20Qapqa%20Group%2018-06-2024.pdf)

© 2024 Qapqa B.V. All rights reserved

```json
{
  "@context" : "https://schema.org",
  "@type" : "Organization",
  "address" : {
    "@type" : "PostalAddress",
    "addressCountry" : "NL",
    "addressLocality" : "Dronten",
    "postalCode" : "8253 RC",
    "streetAddress" : "De Amer 24"
  },
  "contactPoint" : {
    "@type" : "ContactPoint",
    "contactType" : "customer service",
    "telephone" : "+31-321-386677"
  },
  "description" : "Specialized pipeline welding subcontractor providing automatic welding systems, weld crews and full service support for oil, gas and water projects.",
  "logo" : "https://qapqa.com/hs-fs/hubfs/Qapqa-logo-CMYK_incl%20JS%20kleur.png",
  "name" : "Qapqa B.V.",
  "sameAs" : [ "https://www.linkedin.com/company/qapqa-bv/", "https://www.youtube.com/@Qapqagroup" ],
  "url" : "https://qapqa.com"
}
```